Oil & Gas Transmission Pipelines from 24" to 48"
Construction of 30-Inch Siahmakan Crude Oil Pipeline

Client: National Iranian South Oilfields Company (NISOC)

Project Delivery Date: In Progress

Project Specifications: Construction of a 30-inch underground pipeline from the Mile 32/12 Siahmakan manifold to the Goreh Pump Station, approximately 29 km long, including launcher, receiver and intermediate valve stations.

Client: Kimia Sanat Mabna Company

Project Delivery Date: In Progress

Project Description: Construction of a 24-inch methanol transmission pipeline from Mirabad Village to Shahid Beheshti Port, Chabahar.

 Client: Iranian Gas Engineering and Development Company

 Project Delivery Date: Dey 1388

Pipeline Length: 72 km

 Client: Iranian Oil Pipelines and Telecommunication Company

Project Delivery Date: Esfand 1386

Pipeline Length: 10.5 km

 Client: Iranian Oil Pipelines and Telecommunication Company

Project Delivery Date: Esfand 1389

Pipeline Length: 73 km

 Client: Petrochemical Industries Company

Project Delivery Date: Shahrivar 1392 

Pipeline Length: 176 km

 Client: National Iranian Gas Company (NIGC)

 Project Delivery Date: Mehr 1385

Pipeline Length: 110 km. During execution of the North Ahvaz 24-inch gas transmission pipeline project, two crossings beneath the Shatiteh and Kargar rivers (a branch of the Karun River) were completed using the HDD method.

Client: Darya Sahel Institute

Project Delivery Date: Dey 1399

Pipeline Length: 15 km

Oil & Gas Transmission Pipelines from 10" to 20"
12-Inch Alamut Region Gas Transmission Pipeline

Client: Gas Engineering and Development Company

Project Delivery Date: Khordad 1393

Pipeline Length: 49 km

Client: Iranian Oil Pipelines and Telecommunication Company

Project Delivery Date: Dey 1391

Pipeline Length: 11.5 km

Client: Bushehr Province Gas Company

Project Delivery Date: Dey 1391

Pipeline Length: 20 km

Client: National Iranian Gas Company (NIGC)

Project Delivery Date: Tir 1386

Pipeline Length: 40 km

Client: Kerman Province Gas Company

Project Delivery Date: Esfand 1383

Pipeline Length: 110 km

 Client: National Iranian Gas Company (NIGC)

Project Delivery Date: Shahrivar 1382

Pipeline Length: 56 km

Client: National Iranian Gas Company (NIGC)

Project Delivery Date: Bahman 1380

Pipeline Length: 24 km

Client: National Iranian Gas Company (NIGC)

Project Delivery Date: Ordibehesht 1382

Pipeline Length: 26 km

Client: National Iranian Gas Company (NIGC)

Project Delivery Date: Aban 1377

Pipeline Length: 65 km

Client: National Iranian Gas Company (NIGC)

Project Delivery Date: Shahrivar 1368

Pipeline Length: 12 km

Client: National Iranian Gas Company (NIGC)

Project Delivery Date: Azar 1368

Pipeline Length: 46 km

Client: National Iranian Gas Company (NIGC)

Project Delivery Date: Ordibehesht 1369

Pipeline Length: 40 km

Client: National Iranian Gas Company (NIGC)

Project Delivery Date: Bahman 1367

Pipeline Length: 24 km

Client: Darya Sahel Institute

Project Delivery Date: Esfand 1399

Pipeline Length: 30 km

Client: Dehloran Petro Refining Company

Delivery Date: Mehr 1403

Project Specifications: 180 km of 10-inch pipeline, 12 LBV stations, launcher, receiver, cathodic protection, non-industrial buildings, and fiber-optic installation.